|
Project Date: 2007
In cooperation with UCLA Capital Programs and architectural design firm Studios Architecture, the Urban Simulation Team produced an existing and proposed condition computer model of the University of California Police Station. The model was used for design tweaking and for the submittal package to the UC Board of Regents Committee on Grounds and Buildings for approval. Located on Westwood Blvd. and scheduled for completion in 2009, the facility will house operations of the University of California Police Department.
|